Ship-to-Shore Connector LCAC during initial well deck interoperability testing with USS Carter Hall in February 2022


Autor:
Ronald Newsome, Naval Surface Warfare Center Panama City Division
Formát:
2800 x 2000 Pixel (3683320 Bytes)
Popis:
The next generation landing craft, Ship to Shore Connector (SSC), Landing Craft, Air Cushion (LCAC), successfully completed well deck interoperability testing with USS Carter Hall (LSD 50) and demonstrated the craft are another step closer to fleet integration. The test event, a collaboration between, PEO Ships, USS Carter Hall, Naval Surface Warfare Center Panama City Division and other stakeholders, was the culmination of months of preparation. The testing also has historical significance, as Panama City, Fla. is the location of the Navy’s Air Cushion Vehicle Center of Excellence with the first-ever well deck operations occurring off Panama City in 1985 between legacy LCAC 01 and USS Whidbey Island (LSD 41).
Licence:
Public domain
Sdílet obrázek:
Facebook   Twitter   Pinterest   WhatsApp   Telegram   E-Mail
Více informací o licenci na obrázek naleznete zde. Poslední aktualizace: Wed, 13 Mar 2024 23:46:36 GMT

Relevantní obrázky


Relevantní články

Ship-to-Shore Connector

Ship-to-Shore Connector je třída amerických vojenských výsadkových vznášedel, vyvíjených pro americké námořnictvo jako náhrada vznášedel Landing Craft Air Cushion. Jejich nosnost ma být zvýšena na 74 tun oproti 60 tunám u vznášedel LCAC. Celkem je plánována výroba 72 sériových vznášedel, která mají být dodána do roku 2028. .. pokračovat ve čtení